Optional_Interior

Optional_Interior

How to Avoid Commercial Fit-Out Pitfalls

When a business rents a space and determines that a commercial ‘fit out’ is needed to make the space usable for their business, there are many aspects to consider.

First and foremost is to analyze what other similar businesses have done in terms of space, quality and visibility.  It is imperative to remember that you do not own the building, and if you move, the majority of the ‘fit out’ will not be transportable.  So, if you ‘over spend’ and then decide to downsize, most of your renovation investment will be wasted.

Read more

From Design to Reality

The Heritage at Claremont received approval of the re-adaptive use of St. Bernard’s Episcopal Church parish house and the construction of a new two-story building housing 16 condominiums units back in April of 2017. The 1912 parish house will be preserved and converted into 4 condominium units. The proposed site improvements, including a new parish house, underground parking garage, stormwater facilities and landscaping were designed to integrate with and complement the surrounding large estate environs. Additionally, pedestrian access to the 1897 church grounds will be enhanced and improved. Construction was anticipated to begin in the spring of 2018.

Read more

Our Process title

Our Process

Pre-Design

pre-de-img

Pre-Design

pre-de-img2

Design phase

de-phase-img

Design Phase

  • Architect meetings with client to review design.
  • Floor plan studies.
arrow-dawn-img

Construction Drawing Phase

draw-phase-img

Construction
Drawing Phase

Read More
Home | About | Blogs | Contact

Call Us

Address - 112 Town Center Drive Warren, NJ, 07059

Footer Copyright

Copyright , Beer Architectural Group, LLC.